Project Overview

Twelve 138kV dead tank circuit breakers at a high-altitude substation in Northern China were long plagued by extreme cold of -30℃, leading to SF6 liquefaction, insulation degradation, and frequent mechanical jamming during operations. In the winter of 2023, one unit suffered a tank fracture and gas leakage due to low temperatures, resulting in a 60-hour power outage and losses exceeding 600,000 RMB. Our company urgently implemented an "All-Lifecycle Comprehensive Anti-Freezing Governance Solution": adopting an SF6/N2 gas mixture (liquefaction point < -40℃), high-toughness steel for the tanks, and a dual-circuit intelligent heat-tracing and temperature/pressure monitoring system. Post-upgrade, the units have operated with zero faults for two consecutive winters in -30℃ conditions, reducing annual O&M costs by 65% and firmly securing the safety of the power grid during extreme cold.

Breaking the "Extreme Cold" Barrier: All-Lifecycle Anti-Freezing Solution for 138kV Dead Tank Circuit Breakers Ensures Zero-Fault Operation in -30℃ Grids

Exceptional Design · Root Cause Eradication

  • Dual Upgrade of Media & Materials: The SF6/N2 gas mixture (SF6 ≤50%) prevents liquefaction. The tank is constructed from high-strength steel with a -40℃ impact toughness ≥27J, combined with cold-resistant fluororubber seals to eliminate fracture risks.

  • Intelligent Thermal Protection: Features a detachable insulation layer and dual-circuit electric heat tracing (automatic activation below -20℃), keeping internal tank temperatures stable above -10℃. Real-time linkage between temperature and pressure sensors provides early warnings and proactive hazard intervention.

  • Precise O&M Empowerment: Dedicated winter pre-season maintenance (replacement of low-temperature lubricants and seal inspections) combined with a modular quick-repair design reduces fault response time to under 2 hours and decreases manual reliance by 75%.

Empowering Infrastructure Development

This solution has been solidified into the "Technical Specifications for Low-Temperature Adaptability of High-Voltage Circuit Breakers in Alpine Regions" and applied at scale across over 40 substations in Inner Mongolia, the Qinghai-Tibet Plateau, and Xinjiang. To date, it has averted 52 low-temperature-related faults and saved over 12 million RMB in annual O&M costs. Through our "Material-Structure-Intelligence" trinity anti-freezing system, we are spearheading a revolution in the environmental adaptability of power equipment, providing a replicable Chinese solution for global alpine grid safety and fulfilling our mission:"Ensuring power reliability, even in extreme environments."


Related Articles

...
Rockwill 2500kVA Step up Transformer Success in Namibia
Rockwill 2500kVA Step up Transformer Success in Namibia
Rockwill 2500kVA transformers support Namibia 20MW PV plant with high-altitude insulation and C5-M anti-corrosion, reducing maintenance costs by 35%.
Successful Case of 263 Units of 33kV Oil-immersed 32-step Voltage Regulator Controller Project in Bangladesh
Successful Case of 263 Units of 33kV Oil-immersed 32-step Voltage Regulator Controller Project in Bangladesh
Rockwill delivered 263 units of 33kV 32-step voltage regulators in Bangladesh. Proven reliability for grid stability. View our technical success story.
Rockwill RGIS Case Study and Gas Insulated Switchgear Project in Ghana
Rockwill RGIS Case Study and Gas Insulated Switchgear Project in Ghana
Read the Rockwill RGIS project success in Ghana providing reliable gas insulated switchgear solutions for enhanced power distribution and grid performance across the region.
Successful Case of 170 Sets of 11kV Automatic Recloser Project in Kenya
Successful Case of 170 Sets of 11kV Automatic Recloser Project in Kenya
170 sets of 11kV automatic recloser project success in Kenya, demonstrating reliable grid automation and enhanced power distribution performance.
Rockwill Ukraine 186 Units 12kV Outdoor Vacuum Recloser Project Success Case
Rockwill Ukraine 186 Units 12kV Outdoor Vacuum Recloser Project Success Case
Rockwill successfully delivered 186 units of 12kV outdoor vacuum reclosers for Ukraine’s distribution network, solving issues like thunderstorms and large temperature differences with intelligent reclosing technology.
Rockwill 400 Units Prefabricated Substation Case Study in Niger
Rockwill 400 Units Prefabricated Substation Case Study in Niger
Rockwill delivered 20kV prefabricated substations to Niger NIGELEC, IEC 62271-202, IP54, French-labeled for Sahel electrification.
Case Study of Rockwill 72.5kV Dead Tank Circuit Breaker Project in South Africa
Case Study of Rockwill 72.5kV Dead Tank Circuit Breaker Project in South Africa
Rockwill 72.5kV Dead Tank Circuit Breaker success case in South Africa providing low maintenance 4000A HV switchgear solutions with built in CTs and 450kV BIL insulation for South African Eskom and mining power networks
Rockwill Intelligent Voltage Regulator Empowers Power Quality Improvement in an Industrial Park in Southeast Asia
Rockwill Intelligent Voltage Regulator Empowers Power Quality Improvement in an Industrial Park in Southeast Asia
Rockwill Intelligent Voltage Regulator empowers power quality improvement in Southeast Asia industrial park with ±0.5% accuracy, ≤1s response & IP54 protection for stable industrial operation.
WhatsApp E-mail Message